Beat the planning fallacy by multiplying effort and time far beyond your first estimate

Hard - Requires significant effort Recommended

Teams chronically underestimate. Psychologists Daniel Kahneman and Amos Tversky called this the planning fallacy: we predict the best case, even when we know better. A manager says, “Two weeks, tops,” then watches scope creep and delays turn it into six. The calendar fills, emails pile up, and the original momentum thins to a trickle. People are not lazy, they’re optimistic, and optimism without data is expensive.

High performers flip the script. They run a pre‑mortem, a simple exercise from organizational psychology. Before starting, they assume the project already failed and list plausible causes. That short list changes how they plan. Suddenly, “slow legal review” becomes 10 extra days, “stakeholder buy‑in” becomes three additional meetings, and “my own context switching” becomes protected, uninterrupted blocks on the calendar. The office hums, phones buzz, and yet the plan stays anchored in base rates, not hope.

Then comes the controversial move: multiply critical inputs by ten and front‑load them. If the last campaign took 200 cold emails to land five demos, they schedule 2,000 sends and 600 follow‑ups, with 800 in week one. It feels excessive on paper, but in practice it buys speed and truth. One founder told me he thought 15 investor meetings would be enough. He booked 150, and by meeting 30 he had the pitch tight and two term sheets inbound. A designer thought a draft would take three hours. She blocked six, finished early, and used the extra time to test a risky concept that won the client.

The science is clear. Pre‑mortems reduce overconfidence by forcing concrete failure scenarios. Base‑rate reasoning uses outside data (your past) to correct rosy assumptions. Multiplying inputs counters the power law in response rates and the reality of drop‑off. Front‑loading taps the “fresh start effect,” increases exposure to feedback early, and creates slack for inevitable surprises. It’s not about working recklessly, it’s about planning with math and acting with urgency.

Start with a quick pre‑mortem: assume it’s two months from now and the project flopped, then write ten reasons. Pull up your last three similar efforts and use their real time and outreach numbers as your new baseline. Now pick two critical inputs—like messages sent and follow‑ups—and plan for ten times your first guess, pulling a third of that work into week one to expose reality fast. Book the blocks on your calendar today and let the early momentum tell you what’s true by Friday.

What You'll Achieve

Internally, you’ll trade optimism bias for calm, data‑driven confidence. Externally, you’ll see faster learning cycles, early wins, and projects finishing closer to schedule with higher throughput.

Do a pre‑mortem and 10X the inputs

1

Run a pre‑mortem for failure

Imagine it’s 60 days from now and the project failed. List 10 reasons why (gatekeeper delays, budget shifts, your own attention drift). This surfaces hidden risks before they hit.

2

Base‑rate your estimates

Look at your past three similar projects. What were the actual time and outreach totals? Use those base rates, not your intuition, as your minimum input budget.

3

Multiply critical inputs by 10

Calls, follow‑ups, demos, drafts—pick the two inputs most correlated with progress and plan 10x the initial volume. If you think 10 outreach messages, schedule 100.

4

Front‑load action in week one

Pull 30–40% of the total planned inputs into the first week. Early momentum exposes reality faster and gives you time to adapt.

Reflection Questions

  • Where did I last underestimate by 2–3x, and what signals did I ignore?
  • Which two inputs most reliably move this project forward?
  • What failure cause am I reluctant to write down—and how will I mitigate it now?
  • What can I front‑load this week to reduce risk later?

Personalization Tips

  • Sales: If you expect 10 proposals, plan 100 first contacts and 30 follow‑ups in week one.
  • Academics: If you think a paper draft takes 3 hours, block 6, gather sources now, and write a rough in one sitting.
The 10x Rule: The Only Difference Between Success and Failure
← Back to Book

The 10x Rule: The Only Difference Between Success and Failure

Grant Cardone 2011
Insight 2 of 8

Ready to Take Action?

Get the Mentorist app and turn insights like these into daily habits.